Profit under stress

The primary default estimate and cap are fixed across the profit scenarios.
ScenarioEffect (₹/week)95% CI (₹/week)nProfit gatePilot
Winsorized profit+529.2169.7 to 888.6752PASSFAIL
Trimmed profit+335.0−6.9 to 676.8744FAILFAIL
Missing profit · low endpoint−1,012.8−1,481.3 to −544.2845FAILFAIL
Missing profit · high endpoint+2,012.21,523.1 to 2,501.3845PASSFAIL

Winsorizing clips values to the pooled 1st and 99th percentiles (₹0.0 to 13,766.6 per week). Trimming drops rows outside those cutoffs. The trim’s weekly-profit interval crosses zero.

The missing-profit scenarios assign the cutoffs in opposite directions by arm. They bound the fitted coefficient for the clipped outcome under the stated support assumption. Each interval is conditional on its completed values and cutoffs.

Reassigning loan groups

Two-sided sharp-null checks. P-values summarize the permutation distribution.
OutcomePermutation p-value
52-week default0.0267
Deposited loan spending0.0133
Profit recorded0.8272

Each of the 9,999 simulated draws preserves the grace group count in each batch. The statistic is the absolute batch-adjusted effect. The loan-spending check uses the batch-only model. The profit test is for whether a value was recorded.

Loan-use coverage

After excluding flagged records, the estimated change in business spending was +343.7 ₹/loan (95% CI −19.0 to 706.5 ₹/loan, n=786). The 95% interval fails the positive-effect check.

This follow-up check uses the released flag to select records and adjusts for batch and loan size. The provenance of the selected records is uncertain. See the loan-use source notes.